Staged OTA update rollout
Firmware rolls out in 1% → 10% → 100% stages; a health gate at every stage, human approval for critical fleets.
Staged OTA update rollout
- Release 5.0.3 signed: 46,200 target devices, 3 fleet segments
- Segments pulled: warehouse sensors, vehicle telematics, critical cold chain
- Plan: 1% canary (462 devices, low risk) → 10% → 100%; critical segment last and approved
- Stage 1 started: 462 devices, 30-minute observation window
- Stage metrics: connectivity 99.6%, crashes 0, battery drain +1.2% (threshold 5%)
- Health gate passed; difference from baseline not statistically significant
- Stage 2 started: 4,620 devices; gate passed, stage 3 ready
- Critical cold-chain segment → product owner approved the 100% rollout
- Team report: 3 stages, 0 rollbacks, 46,200 devices on 5.0.3; record stored with the release
- ■completed
Simulation · derived from real agent definitions · every agent can be built by dialogue with the Autonomous Agent and validated with a test corpus
Signed firmware release event from CI/CD
Release reached the fleet through health gates or was rolled back automatically; every step recorded
Agents
Rollout Supervisor
Decomposes the objective, delegates to agents, manages approval points, merges the result.
Plan Agent
Chooses stages and the canary group
get_fleet_segmentsselect_canarycreate_rollout_planHealth Agent
Evaluates metrics after each stage
get_stage_metricscompare_baselinedecide_gateDeploy Agent
Starts a stage, rolls back if needed
start_stagepause_rolloutrollback_stagenotify_teamSteps
| # | Kind | Agent | What happens | System | ms | tok |
|---|---|---|---|---|---|---|
| 01 | ingest | Rollout Supervisor | Release 5.0.3 signed: 46,200 target devices, 3 fleet segments | CI/CD (signed artefacts) | 200 | — |
| 02 | tool | Plan Agent | Segments pulled: warehouse sensors, vehicle telematics, critical cold chain | Device Management / OTA | 420 | — |
| 03 | reason | Plan Agent | Plan: 1% canary (462 devices, low risk) → 10% → 100%; critical segment last and approved | — | 700 | 820 |
| 04 | write | Deploy Agent | Stage 1 started: 462 devices, 30-minute observation window | Device Management / OTA | 480 | — |
| 05 | tool | Health Agent | Stage metrics: connectivity 99.6%, crashes 0, battery drain +1.2% (threshold 5%) | Observability (metrics) | 520 | — |
| 06 | verify | Health Agent | Health gate passed; difference from baseline not statistically significant | — | 560 | 520 |
| 07 | write | Deploy Agent | Stage 2 started: 4,620 devices; gate passed, stage 3 ready | Device Management / OTA | 520 | — |
| 08 | approval | Rollout Supervisor | Critical cold-chain segment → product owner approved the 100% rollout | — | 2,800 | — |
| 09 | notify | Deploy Agent | Team report: 3 stages, 0 rollbacks, 46,200 devices on 5.0.3; record stored with the release | Slack | 240 | — |
Device fleet anomaly triage
Telemetry anomalies from thousands of devices are clustered, root-cause candidates listed, one incident reaches the right team.
Cold-chain excursion response
A temperature excursion is assessed instantly, product risk computed, a field crew dispatched, the quality decision recorded.
Time to move from experimenting with AI to transforming with it.
In a 30-minute discovery session we take your 2–3 priority business problems, show a live demo of a similar scenario, and draft a roadmap that starts with the Value layer.
- Your 2–3 priority problems
- Live demo of a similar scenario
- Roadmap starting with value analysis